Inputs
mm/hr (use IDF curve for design)
Time of Concentration (Kirpich)
m
m
min
Sub-areas
Runoff coefficient (C) typical values
- Asphalt / concrete pavement: 0.75 – 0.95
- Gravel / unpaved roads: 0.40 – 0.60
- Roofs: 0.75 – 0.95
- Lawns & parks (heavy soil, flat < 2%): 0.13 – 0.25
- Lawns (sandy soil, flat < 2%): 0.05 – 0.10
- Wooded / forested areas: 0.10 – 0.30
- Cultivated land (sandy / loam): 0.20 – 0.50
Kirpich (1940)
- SI form: tc = 0.0195 · L0.77 · S−0.385 (minutes; L in m, S in m/m)
- US form: tc = 0.0078 · L0.77 · S−0.385 (min; L in ft)
- Use intensity i corresponding to tc from your local IDF curve.
Results
Total Area—
Weighted C—
Time of Concentration tc—
Slope (from H/L)—
Peak Discharge Q—
Q (alt units)—
Sub-area Breakdown
| Surface | C | Area | C·A |
|---|