Inputs
Method (AISC 360-I)
- C_full = min(0.85·f'c·be·t , As·Fy).
- n_studs = ceil(C_full / Qn) per half-span (×2 total for simple span).
- For partial composite, scale C accordingly (0.75 here).
- Plastic moment: Mn ≈ C·(d/2 + t/2 − a/2), a = C/(0.85·f'c·be).
Results
Concrete force C_conc—
Steel force T_steel—
Governing C—
Stress block a—
Studs per half span—
Total studs (simple beam)—
Plastic Mn—