"Forty times the bar diameter" is the lap length many of us learned on site. It is easy to remember, and sometimes it is close. But NSCP 2015 gives a proper way to compute it, and the answer can be much shorter or much longer than 40db depending on the concrete, the cover, the bar position and the ties.
This article explains what development length is, then works through one 20 mm bar with every step shown.
What development length means
A bar can only reach its yield stress fy if it is gripped by enough concrete. The grip comes from the ribs of the bar bearing on the concrete around it. Development length ld is the embedded length needed so the bar yields before it pulls out or splits the concrete.
Wherever a bar must carry its full stress, for example at the face of a support or at the point of maximum moment, it needs at least ld of embedment beyond that point, straight, hooked or headed.
A lap splice is two bars overlapping so that one passes its force to the other through the concrete. Its length is based on ld.
The example
- Bar: 20 mm, in tension, bottom bar (not a "top bar")
- f'c = 28 MPa, fy = 420 MPa, normal-weight concrete, uncoated bars
- Clear cover 40 mm, clear spacing between bars 75 mm
- Ties: 10 mm, 2 legs, @ 150 mm, 3 bars being developed across the tie
Common numbers: √28 = 5.29 MPa (under the 8.3 MPa cap of 425.4.1.4).
Step 1. The modification factors (Table 425.4.2.4)
| Factor | What it accounts for | Value here |
|---|---|---|
| ψt | top bar (more than 300 mm of fresh concrete below it) | 1.0 (bottom bar) |
| ψe | epoxy coating | 1.0 (uncoated) |
| ψs | bar size: 20 mm and smaller get a reduction | 0.8 |
| λ | lightweight concrete | 1.0 (normal-weight) |
Step 2. Confinement term
cb is the smaller of the cover to the bar centre and half the centre-to-centre spacing:
cb = min(40 + 20/2, (75 + 20)/2) = min(50, 47.5) = 47.5 mm
The ties add confinement through Ktr (Eq. 425.4.2.3b):
Atr = 2 × 78.5 = 157.1 mm²
Ktr = 40 × Atr / (s × n) = 40 × 157.1 / (150 × 3) = 13.96 mm
(cb + Ktr) / db = (47.5 + 13.96) / 20 = 3.07 → capped at 2.5
Step 3. Development length, detailed equation (Eq. 425.4.2.3a)
ld = [ fy / (1.1 λ √f'c) × (ψt ψe ψs) / ((cb + Ktr)/db) ] × db
ld = [ 420 / (1.1 × 1.0 × 5.29) × (1.0 × 1.0 × 0.8) / 2.5 ] × 20
ld = 72.16 × 0.32 × 20 = 461.8 mm (≥ 300 mm minimum, OK)
That is about 23db, much less than 40db, because the cover and ties are good and the bar is small.
Step 4. The simple table (Table 425.4.2.2), for comparison
If the clear spacing is at least db, the cover is at least db, and minimum ties are provided, NSCP allows a quick formula without working out cb and Ktr. For 20 mm and smaller bars:
ld = fy ψt ψe / (2.1 λ √f'c) × db = 420 / (2.1 × 5.29) × 20 = 755.9 mm
That is 38db, close to the old "40db" rule. The table is quick and safe, but it costs you over 60% more length than the detailed equation here. On a big job, that is a lot of steel.
Step 5. Tension lap splices (425.5.2)
NSCP has two classes:
- Class A = 1.0 ld, allowed only if As provided ≥ 2 × As required over the whole lap and no more than half the bars are spliced in the lap length.
- Class B = 1.3 ld, everything else. This is the usual case.
With ld = 461.8 mm:
Class A = 461.8 mm; Class B = 1.3 × 461.8 = 600.4 mm (both ≥ 300 mm)
Use Class B, 600 mm (30db), unless you have checked the Class A conditions.
When bars of different size are lapped, the lap is the larger of ld of the larger bar and the lap length of the smaller bar (425.5.2.2).
Step 6. Bars in compression (425.4.9)
ldc = max(0.24 fy / (λ √f'c) × db, 0.043 fy × db)
= max(0.24 × 420 / 5.29 × 20, 0.043 × 420 × 20) = max(381.0, 361.2) = 381 mm
Compression lap for fy ≤ 420 MPa (425.5.5.1): 0.071 × fy × db = 0.071 × 420 × 20 = 596.4 mm (≥ 300 mm). If f'c is below 21 MPa, the compression lap is increased by one-third.
Step 7. Standard hooks (425.4.3)
When there is no room for a straight bar, as at an exterior beam-column joint, use a standard hook:
ldh = 0.24 fy ψe ψc ψr / (λ √f'c) × db
Side cover here is at least 65 mm (and the tail cover of a 90-degree hook at least 50 mm), so ψc = 0.7. With no ties enclosing the hook, ψr = 1.0:
ldh = 0.24 × 420 × 0.7 / 5.29 × 20 = about 266 mm (≥ 8db = 160 mm and ≥ 150 mm, OK)
Hook geometry for a 20 mm bar: inside bend diameter 6db = 120 mm; tail 12db = 240 mm for a 90-degree hook, 4db (min 65 mm) = 80 mm for a 180-degree hook.
How much do the factors matter?
Change only two things: make it a 32 mm epoxy-coated top bar (more than 300 mm of concrete cast below it).
- ψt = 1.3, ψe = 1.5, but their product is capped at 1.7
- ψs = 1.0 (25 mm and larger)
- cb = 53.5 mm, (cb + Ktr)/db = 2.11
ld = 72.16 × 1.7 × 1.0 / 2.11 × 32 = 1,862 mm, about 58db
The same "40db" rule would be short by almost 600 mm. This is why a blanket rule is risky: it is too long for small bottom bars and too short for large top bars.
Quick site guide
| Situation | Rough length (f'c 28, fy 420, good cover and ties) |
|---|---|
| 20 mm bottom bar, ld | about 460 mm (23db) |
| 20 mm, Class B tension lap | about 600 mm (30db) |
| 20 mm, compression lap | about 600 mm (30db) |
| 20 mm, 90-degree hook | about 270 mm embedment + 240 mm tail |
| 32 mm epoxy top bar, ld | about 1,860 mm (58db) |
These are for this example only. Lower f'c, smaller cover or closer bar spacing all increase the length. Always compute for your own case.
General information only. Follow the approved structural plans and the engineer of record.