Skip to the article

Why Column Ties Need 135-Degree Hooks (and Closer Spacing Near the Beams)

By 6 min readUpdated

Look at many column cages on residential sites and you will see the same tie: one square loop of 10 mm bar around the outside bars, hooks bent at 90 degrees, spaced at 200 mm from top to bottom. It is fast to bend and easy to tie.

For a column in a building that has to resist earthquakes, that detail is not enough. Here is why, with a real column checked to NSCP 2015.

What happens to a column in an earthquake

In a strong earthquake the ends of a column, just below and above the beams, are bent back and forth hard. The outer layer of concrete (the cover) cracks and falls off. That is expected; the design assumes it.

Once the cover is gone, the ties are the only thing holding the column together:

  • A 90-degree hook is anchored only in the cover. When the cover spalls, nothing holds the hook. It opens, the tie lets go, and the vertical bars buckle outward. The concrete core then crushes.
  • A 135-degree hook bends back into the core of the column. Even with the cover gone, it stays anchored in confined concrete and keeps holding.

That is why NSCP 2015 requires closed hoops with seismic hooks in special moment frame (SMRF) columns: a 135-degree bend with an extension of at least 6 bar diameters, but not less than 75 mm, into the core (Section 425.3 for the hook, 418.7.5.2 for the hoops).

90-degree hook versus 135-degree seismic hook at a column corner Two corner details of the same column section, drawn to scale: 40 mm cover, 25 mm corner bar, 10 mm tie. Left: a tie end with a 90-degree hook whose tail runs along the face, anchored only in the cover; when the cover spalls in a strong earthquake the tail swings out and the corner bar buckles outward. Right: a tie end with a 135-degree seismic hook whose tail is bent back into the confined core with an extension of at least 6 bar diameters and not less than 75 mm. A table gives 6 x 10 = 60 mm and 6 x 12 = 72 mm, so 75 mm governs for 10 mm and 12 mm ties. 90° hook OPENS Common site tie: the tail lies along the face 40 90° corner bar, 25 mm tie, 10 mm tail opens bar buckles out Tail lies along the face: anchored only in the cover. Cover spalls, hook opens, tie lets go. 135° seismic hook HOLDS NSCP 2015 SMRF hoop: the tail goes into the core 40 135° corner bar, 25 mm tie, 10 mm ≥ 6db, ≥ 75 mm extension Tail bent back into the core: still anchored in confined concrete after the cover spalls. The tie keeps holding. cover, 40 mm: spalls off in a strong earthquake edge of the confined core Seismic hook extension (NSCP 2015, 425.3): at least 6db, but not less than 75 mm 10 mm tie: 6 × 10 = 60 mm, so 75 mm governs 12 mm tie: 6 × 12 = 72 mm, so 75 mm governs db = diameter of the tie bar. Corner of the 500 × 500 test column, drawn to scale; rest of the tie not shown.
Figure 1. 90-degree hook versus 135-degree seismic hook at one corner of the test column, drawn to scale (40 mm cover, 25 mm bar, 10 mm tie). The 90-degree tail lies along the face and opens when the cover spalls; the 135-degree tail goes into the core, with an extension of at least 6db and 75 mm.

The test column

To show the difference, I ran the same column through our RC Column Section Designer SMRF (NSCP 2015) twice. It is the sheet's own sample:

  • Ground-floor column of a 4-storey SMRF building
  • 500 × 500 mm, 12 bars of 25 mm
  • f'c = 28 MPa, fy = 420 MPa, 40 mm cover
  • Same loads and beams in both cases. Only the ties change.

Case A: the common site detail

One 10 mm perimeter tie, 90-degree hooks, @ 200 mm from top to bottom.

Check (NSCP 2015) Needed Provided Result
Confinement steel Ash (418.7.5.4)701 mm²157 mm²FAIL, 4.5 times short
Tie spacing in the end zone (418.7.5.3)100 mm max200 mmFAIL
Middle bars held by a hoop corner or crosstie (425.7.2.3)every corner and alternate barcorners onlyFAIL
Joint tiessame as end zone200 mmFAIL

Overall: REVISE COLUMN.

Where does 701 mm² come from? NSCP 418.7.5.4 asks for the larger of two formulas. The governing one here is

Ash = 0.3 · s · bc · (f'c / fyt) · (Ag / Ach − 1)

With s = 200 mm, core width bc = 420 mm, f'c = 28, fyt = 420, Ag = 500² and Ach = 420²: Ash = 0.3 × 200 × 420 × (28/420) × (250,000/176,400 − 1) ≈ 701 mm². One 10 mm tie has two legs in each direction: 2 × 78.5 = 157 mm².

The spacing limit is the smallest of b/4 = 125 mm, 6 × 25 = 150 mm, and s₀ = 100 + (350 − hx)/3, which is capped at 100 mm when the tie legs are far apart (hx = 375 mm here). So the limit is 100 mm.

Case B: the corrected detail

12 mm hoops plus crossties, 4 legs each way, 135-degree hooks:

  • @ 120 mm in the end zones, ℓo = 500 mm from each beam face, and through the beam-column joint
  • @ 150 mm at mid-height
Check Needed Provided Result
Confinement Ash at s = 120421 mm²452 mm² (4 × 113)PASS
End-zone spacing125 mm max120 mmPASS
Every corner and alternate bar heldyesyesPASS

Overall: COLUMN ADEQUATE (SMRF).

The sheet's own check summary for the two runs, case A ending in REVISE COLUMN and case B in COLUMN ADEQUATE (SMRF). Crops from the RC Column Section Designer SMRF; case labels and column headings added.
Figure 2. The sheet's own check summary for the two runs, case A ending in REVISE COLUMN and case B in COLUMN ADEQUATE (SMRF). Crops from the RC Column Section Designer SMRF; case labels and column headings added.

Notice what changed: more legs (crossties), slightly bigger bar, closer spacing only at the ends. The crossties also cut hx, the distance between legs, so the spacing limit rises from 100 to 125 mm. Good detailing makes the rules easier to meet.

Column section 500 x 500 mm: case A one perimeter tie versus case B hoop with crossties Two cross-sections of the same 500 by 500 mm column with 12 bars of 25 mm, drawn to scale. Case A: one 10 mm perimeter tie with 90-degree hooks at 200 mm; only the four corner bars are held and the 8 middle bars are not; a cut line crosses 2 tie legs, so Ash = 2 x 78.5 = 157 mm2 against 701 mm2 needed at s = 200 mm, 4.5 times short, FAIL, end-zone spacing 200 mm against 100 mm maximum, FAIL, overall REVISE COLUMN. Case B: 12 mm hoop plus crossties with 135-degree hooks; the cut line crosses 4 legs, so Ash = 4 x 113 = 452 mm2 against 421 mm2 needed at s = 120 mm, PASS, end-zone spacing 120 mm against 125 mm maximum, PASS, overall COLUMN ADEQUATE (SMRF). Case A: common site detail FAIL One 10 mm perimeter tie, 90° hooks, @ 200 mm from top to bottom 500 500 1 2 8 middle bars not held (corners only) 2 legs cross the cut: Ash = 2 × 78.5 = 157 mm² Ash each way at s = 200 mm (mm²) needed 701 provided 157 Confinement: 4.5 times short End-zone spacing 200 mm, max 100 mm Overall: REVISE COLUMN Case B: corrected detail PASS 12 mm hoops plus crossties, 135° hooks, @ 120 mm in the end zones, 150 mm mid-height 500 500 1 2 3 4 Every corner and alternate bar held 4 legs cross the cut: Ash = 4 × 113 = 452 mm² Ash each way at s = 120 mm (mm²) needed 421 provided 452 Confinement: 452 ≥ 421 End-zone spacing 120 mm, max 125 mm Overall: COLUMN ADEQUATE (SMRF)
Figure 3. Section of the 500 × 500 mm test column, drawn to scale. Case A: one 10 mm tie, 2 legs cross a cut through the column, Ash = 157 mm² against 701 mm² needed. Case B: 12 mm hoop plus crossties, 4 legs, Ash = 452 mm² against 421 mm² needed.

Why only the ends are tighter

The end zone length ℓo is the largest of the column depth, one-sixth of the clear height, and 450 mm (NSCP 418.7.5.1). That is where the bending is largest in an earthquake and where the cover spalls first. In the middle of the column the ties mainly stop bars from buckling and carry shear, so 418.7.5.5 allows wider spacing, here 6 × 25 = 150 mm.

Column elevation: tie spacing in the end zones, mid-height and joint, case A versus case B Two elevations of the same ground-floor column, 500 mm wide, clear height 2800 mm between beams, roughly to scale. Case A: ties at 200 mm from top to bottom and 200 mm in the joint; the end zones and the joint need at most 100 mm and mid-height at most 6 x 25 = 150 mm, FAIL. Case B: hoops at 120 mm within the end zones lo = 500 mm at each end and through the beam-column joint, and 150 mm at mid-height (1800 mm); maximum 125 mm in the end zones and 6 x 25 = 150 mm at mid-height, PASS. lo is the largest of h = 500, 2800/6 = 467 and 450 mm, so 500 mm. Case A: common site detail FAIL 10 mm ties @ 200 mm, top to bottom 500 1800 500 beam beam joint: @ 200 max 100: FAIL ℓo = 500: @ 200 max 100: FAIL mid-height: @ 200 max 150: FAIL ℓo = 500: @ 200 max 100: FAIL joint Case B: corrected detail PASS 12 mm hoops + crossties, 135° hooks 500 1800 500 beam beam joint: @ 120 same as end zone ℓo = 500: @ 120 max 125: PASS mid-height: @ 150 max 6 × 25 = 150 ℓo = 500: @ 120 max 125: PASS joint ℓo = largest of h = 500, ℓu/6 = 2800/6 ≈ 467 and 450, so 500 mm (NSCP 2015, 418.7.5.1). Clear height ℓu = 2800 mm (the sheet’s sample column). Dimensions in mm. Red lines = ties or hoops; shaded = ℓo.
Figure 4. Column elevation, roughly to scale. Case A: ties @ 200 mm everywhere, where the end zones and the joint need 100 mm or less and mid-height 150 mm or less. Case B: hoops @ 120 mm within ℓo = 500 mm at each end and through the joint, and @ 150 mm at mid-height.

What to check on site

  1. Every hoop closed, with 135-degree hooks, and hook ends pointing into the core.
  2. Hook extension at least 6db and 75 mm (for 10 mm bars that is 75 mm; for 12 mm, 75 mm).
  3. Crossties on the middle bars as shown on the plans. Their 90-degree ends alternate from one tie to the next.
  4. Closer spacing within ℓo at the top and bottom, and inside the beam-column joint. The joint ties are the ones most often left out, because they are hard to place once the beam bars are in.
  5. Ties placed before the concrete, not "pushed in" later.

A note on blame

This is not about any one trade. Many crews were simply taught the 90-degree tie on non-seismic work, and it looks the same on a drawing at small scale. The fix is a clear hook detail on the plans and a quick check before the pour.

General information only. Follow the approved structural plans and the engineer of record.